Mosty Łódź as the General Contractor carried out the project: "Construction of the bridge over the Oder River along Voivodeship Road No. 323 in Ciechanów and Radoszyce". It was an investment of the Lower Silesia Road and Railway Service. The project was co-financed by the European Regional Development Fund as part of the ROP for the Lower Silesia Voivodeship for 2007–2013.

The constructed bridge is located along Voivodeship Road 323. It is 545.60 long and 15.10 m wide. The maximum height of intermediate supports is 8.50 m. The bridge crosses the Oder River, its floodplains and local roads at every bridgehead.

The construction started in March 2010, and was completed in September 2012.

Project challenge: The superstructure was built using two methods. Pre-stressed concreting for the main span and intermediate spans, and concreting of span after span on scaffoldings for flood spans. After building all segments and installing the keystones, the superstructure was post-tensioned with external cables.

News and events

Read all