Engineering structures on Expressway S19 - Mosty Łódź S.A.

Engineering structures on Expressway S19

Mosty Łódź performed bridge works under the project "Construction of Expressway S-19 Section Stobierna – Rzeszów".

The construction work was performed from March 2010 to September 2011. The project was divided into two sections. Bridge works on the first section included the construction of three viaducts and one bridge. One viaduct and two bridges over the old riverbed of the Wisłok River were constructed as part of the second section.

Project challenge: The total length of one of the bridges over the Wisłok River was over 206 m.

News and events

Read all